Location: Vancouver, BC
10,140 tons
10,140 tons
The Cassiar Connector project upgraded 2.3 km of highway south of the Ironworkers Memorial Bridge, and involved the construction of seven new overpasses, 20 retaining walls, a pedestrian bridge, two new interchanges and the Cassiar Tunnel itself which is 730m long.